 |
Obtain credit for: |
|
| » |
IEQ Credit 1: Outdoor Air Delivery Monitoring |
|
|
|
 |
Measure the outdoor air ventilation rate/volume required by: |
|
| » |
IEQ Prerequisite 1: Minimum Indoor Air Quality Performance |
| » |
IEQ Credit 2: Increased Ventilation |
| » |
IEQ Credit 3.2: Construction Indoor Air Quality Management Plan-Before Occupancy* |
|
|
|
 |
Reduce HVAC energy consumption associated with outdoor air ventilation and building pressurization required by: |
|
| » |
EA Prerequisite 2: Minimum Energy Performance |
| » |
EA Credit 1: Optimize Energy Performance |
|
|
|
 |
Measure HVAC energy consumption associated with outdoor air ventilation and building pressurization required by: |
|
| » |
EA Credit 5: Measurement and Verification* |
| » |
EA Credit 5.1: Measurement and Verification-Base Building* |
| » |
EA Credit 5.2: Measurement and Verification-Tenant Submetering* |
|
|
|
 |
Verify HVAC system performance required by: |
|
| » |
EA Prerequisite 1: Fundamental Commissioning of Building Energy Systems |
| » |
EA Credit 3: Enhanced Commissioning |
|
|
|
 |
Control room/space pressure required by: |
|
| » |
IEQ Prerequisite 2: Environmental Tobacco Smoke Control |
| » |
IEQ Credit 3/3.1: Construction Indoor Air Quality Management Plan-During Construction |
| » |
IEQ Credit 5: Indoor Chemical and Pollutant Source Control |
|
|
|
 |
Control thermal comfort required by: |
|
| » |
IEQ Credit 6/6.2: Controllability of Systems-Thermal Comfort |
| » |
IEQ Credit 7/7.1: Thermal Comfort Design |
| » |
IEQ Credit 7.2: Thermal Comfort-Verification* |
|
| * Credit not applicable to all rating systems |